TOTAL-GS-PVV-811
|
2004
|
PINPING VALVES VESSELS , Diatom earth pre coat filters
|
TOTAL-GS-PVV-812
|
2004
|
PINPING VALVES VESSELS , Skid mounted flotation unit
|
TOTAL-GS-PVV-813
|
2004
|
PINPING VALVES VESSELS , Skid mount unites for static equipment
|
TOTAL-GS-PVV-814
|
2004
|
PINPING VALVES VESSELS , Skid mounted units for chemical products injection systems
|
TOTAL-GS-PVV-912
|
2004
|
PINPING VALVES VESSELS , Piping fabrication facilities survey
|
TOTAL-GS-PVV-913
|
2004
|
PINPING VALVES VESSELS , Quality assurance questionnaire for piping fabrication
|
TOTAL-GS-PVV-920
|
2004
|
PINPING VALVES VESSELS , Inspection procedure for pressure vessels
|
TOTAL-GS-PVV-921
|
2004
|
PINPING VALVES VESSELS , Check list for inspection of pressure vessels
|
TOTAL-GS-PVV-922
|
2004
|
PINPING VALVES VESSELS , Plant survey pressure vessles and heat exchangers
|
TOTAL-GS-PVV-923
|
2004
|
PINPING VALVES VESSELS , Vendor quality assurance questionnaire pressure vessels and heat exchanger
|
TOTAL-GS-PVV-924
|
2004
|
PINPING VALVES VESSELS , Agenda for technical audit of pressure vessels and heat exchangers manufac
|
TOTAL-GS-PVV-929
|
2004
|
PINPING VALVES VESSELS , In service inspection for HK/SSCC checks on pressure vessles
|
TOTAL-GS-PVV-942
|
2004
|
PINPING VALVES VESSELS , Shop survey - Valves
|
TOTAL-GS-PVV-943
|
2004
|
PINPING VALVES VESSELS , Quality assurance questionnaire – Valves
|
TOTAL-GS-SAF-260
|
2004
|
SAFETY , (HIPS)
|
TOTAL-GS-SAF-311
|
2004
|
SAFETY , Rules for the selection of fire – fighting systems
|
TOTAL-GS-SAF-312
|
2004
|
SAFETY , Guidelines for selecting and installing fire and gas detection systems
|
TOTAL-GS-SAF-321
|
2004
|
SAFETY , Fire pump stations and fire water mains
|
TOTAL-GS-SAF-322
|
2004
|
SAFETY , Fixed fire water systems
|
TOTAL-GS-SAF-331
|
2004
|
SAFETY , Carbon dioxide fire extinguishing systems
|
TOTAL-GS-SAF-332
|
2004
|
SAFETY , Alternatives to halon in fire extinguishing systems
|
TOTAL-GS-SAF-334
|
2004
|
SAFETY , Foam fire extinguishing systems
|
TOTAL-GS-SAF-337
|
2004
|
SAFETY , Passive fire protection
|
TOTAL-GS-SAF-341
|
2004
|
SAFETY , Location and protection of onshore hydrocarbon storage
|
TOTAL-GS-SAF-351
|
2004
|
SAFETY , Escape , evacuation and rescue from fixed installations
|
TOTAL-GS-SAF-371
|
2004
|
SAFETY , Emergency control facilities
|
TOTAL-GS-SPS-001
|
2004
|
SUBSEA SYSTEMS , Design philosophy and requirements for subsea stations
|
TOTAL-GS-SPS-002
|
2004
|
SUBSEA SYSTEMS , Design of subsea structures
|
TOTAL-GS-SPS-003
|
2004
|
SUBSEA SYSTEMS , Foundation design considerations for subsea stations
|
TOTAL-GS-SPS-004
|
2004
|
SUBSEA SYSTEMS , Subsea manifold system gate valves
|
TOTAL-GS-SPS-005
|
2004
|
SUBSEA SYSTEMS , Subsea ball valves
|
TOTAL-GS-SPS-006
|
2004
|
SUBSEA SYSTEMS , Service valves in subsea stations
|
TOTAL-GS-SPS-007
|
2004
|
SUBSEA SYSTEMS , Tie-in systems
|
TOTAL-GS-SPS-008
|
2004
|
SUBSEA SYSTEMS , Thermal insulation of subsea stations
|
TOTAL-GS-SPS-009
|
2004
|
SUBSEA SYSTEMS , Corrosion protection of subsea stations
|
TOTAL-GS-SPS-010
|
2004
|
SUBSEA SYSTEMS , Preservation requirements for subsea package
|
TOTAL-GS-SPS-011
|
2004
|
SUBSEA SYSTEMS , Mechanical completion of subsea stations
|
TOTAL-GS-SPS-012
|
2004
|
SUBSEA SYSTEMS , Documentation requirements for subsea stations
|
TOTAL-GS-SPS-013
|
2004
|
SUBSEA SYSTEMS , Wellhead and quidance systems
|
TOTAL-GS-SPS-014
|
2004
|
SUBSEA SYSTEMS , Drill through horizontal tree systems
|
TOTAL-GS-SPS-015
|
2004
|
SUBSEA SYSTEMS , Subsea gate valves and actuators in subsea Xmas – tree systems
|
TOTAL-GS-SPS-016
|
2004
|
SUBSEA SYSTEMS , Sub sea insert chokes and associated running and retrieval tools
|
TOTAL-GS-SPS-017
|
2004
|
SUBSEA SYSTEMS , Work over completion systems for drill through horizontal tree
|
TOTAL-GS-SPS-019
|
2004
|
SUBSEA SYSTEMS , Sub sea production control system
|
TOTAL-GS-SPS-020
|
2004
|
SUBSEA SYSTEMS , Sub sea control unit functional requirements
|
TOTAL-GS-SPS-021
|
2004
|
SUBSEA SYSTEMS , Sub sea mate able electrical / optical connectors
|
TOTAL-GS-SPS-022
|
2004
|
SUBSEA SYSTEMS , Environmental testing of sub sea electronics
|
TOTAL-GS-SPS-023
|
2004
|
SUBSEA SYSTEMS , Cleaning and flushing of hydraulic systems
|
TOTAL-GS-SPS-024
|
2004
|
SUBSEA SYSTEMS , Sub sea mechanical quarter turn actuator (manually operated gearbox)
|
TOTAL-GS-SPS-025
|
2004
|
SUBSEA SYSTEMS , Sub sea hydraulic spring return quarter turn actuators
|