TOTAL-GS-ELE-451
|
2004
|
ELECTRICAL , Third party inspection. Independent verification of electrical facilities.
|
TOTAL-GS-ELE-765
|
2004
|
ELECTRICAL , Subsea cables
|
TOTAL-GS-ENV-001
|
2004
|
ENVIRONMENT , Environmental requirements for oil and gas projects design
|
TOTAL-GS-ENV-011
|
2000
|
ENVIRONMENT , Environmental specification onshore pipeline construction
|
TOTAL-GS-ENV-111
|
2004
|
ENVIRONMENT , Baseline study environmental status of an onshore site
|
TOTAL-GS-ENV-112
|
2004
|
ENVIRONMENT , Off shore environmental baseline study
|
TOTAL-GS-ENV-113
|
2004
|
ENVIRONMENT , Environmental baseline study coastal survey
|
TOTAL-GS-ENV-121
|
2004
|
ENVIRONMENT , Environmental impact assessment onshore activities
|
TOTAL-GS-ENV-122
|
2004
|
ENVIRONMENT , Environmental impact assessment offshore activities
|
TOTAL-GS-ENV-210
|
2004
|
ENVIRONMENT , Liquid effluents drainage systems
|
TOTAL-GS-ENV-270
|
2004
|
ENVIRONMENT , Deep well disposal
|
TOTAL-GS-ENV-421
|
2004
|
ENVIRONMENT , Landfill design and operation for e&p sites
|
TOTAL-GS-ENV-500
|
2004
|
ENVIRONMENT , Noise abatement in production units
|
TOTAL-GS-EXP-101
|
2000
|
Precommissoning and commissioning specification
|
TOTAL-GS-EXP-103
|
2000
|
Precommissioning and commissioning technical preparation
|
TOTAL-GS-EXP-105
|
2000
|
Precommissioning and commissioning technical preparation
|
TOTAL-GS-EXP-107
|
2004
|
Commissioning execution
|
TOTAL-GS-EXP-201
|
2004
|
Maintenance preparation during a project phase . Maintainability criteria
|
TOTAL-GS-EXP-203
|
2004
|
Maintencace preparation during a project phase . Documentation
|
TOTAL-GS-EXP-205
|
2004
|
Manintancae preparation during project phase spare parts
|
TOTAL-GS-EXP-207
|
2004
|
Installation description structure
|
TOTAL-GS-EXP-209
|
2004
|
Performance indicators for maintenance & inspection reporting
|
TOTAL-GS-EXP-211
|
2004
|
Plant integrity .minimum inspection requrements
|
TOTAL-GS-EXP-401
|
2004
|
Quantitative risk assessment of oil and gas installations
|
TOTAL-GS-EXP-403
|
2004
|
Production availability studies of oil and gas systems
|
TOTAL-GS-GEO-101
|
2004
|
SURVEYS , Offshore Geotechnical Soil Survey
|
TOTAL-GS-GEO-102
|
2000
|
SURVEYS , Onshore geotechnical soil survey
|
TOTAL-GS-GEO-201
|
2000
|
SURVEYS , Offshore geophysical surveys
|
TOTAL-GS-GEO-202
|
2000
|
SURVEYS , Geophysical survey for offshore pipeline installation
|
TOTAL-GS-GEO-203
|
2000
|
SURVEYS , Geophysical survey for offshore pipeline inspection
|
TOTAL-GS-GEO-204
|
2004
|
SURVEYS , Geophysical debris survey
|
TOTAL-GS-GEO-301
|
2004
|
SURVEYS , Offshore surface positioning works
|
TOTAL-GS-GEO-302
|
2004
|
SURVEYS , Subsea positioning works
|
TOTAL-GS-GEO-304
|
2004
|
SURVEYS , RTK positioning for bathymetric and geophysical surveys
|
TOTAL-GS-GEO-305
|
2004
|
SURVEYS , Aerial photography survey
|
TOTAL-GS-GEO-306
|
2004
|
SURVEYS , Geodetic survey for aerotriangulation MAP processing
|
TOTAL-GS-GEO-501
|
2004
|
SURVEYS , Metocean survey
|
TOTAL-GS-GEO-502
|
2004
|
SURVEYS , Meteorological survey of land location
|
TOTAL-GS-GEO-503
|
2004
|
SURVEYS , Rapid evaluation of metocean conditions for basic studies
|
TOTAL-GS-GEO-504
|
2004
|
SURVEYS , Comprehensive evaluation of metocean conditions for offshore projects.
|
TOTAL-GS-GEO-701
|
2004
|
SURVEYS , Geotechnical data and foundation design considerations for subsea production systems and p
|
TOTAL-GS-GEO-702
|
2004
|
SURVEYS , Requirements for design and installation of skirted foundations and suction anchors.
|
TOTAL-GS-GEO-703
|
2004
|
SURVEYS , Requirements for design and installation of drag anchors and anchor piles for offshore flo
|
TOTAL-GS-HVA-000
|
2004
|
HVAC , List of HVAC specifications
|
TOTAL-GS-HVA-100
|
2004
|
HVAC , Basis of design
|
TOTAL-GS-HVA-200
|
2004
|
HVAC , List of HVAC vendors
|
TOTAL-GS-HVA-202
|
2004
|
HVAC , Air handling unit (AHU)
|
TOTAL-GS-HVA-204
|
2004
|
HVAC , Anti – blast HVAC installations
|
TOTAL-GS-HVA-208
|
2004
|
HVAC , Ducts and accessories for HVAC systems
|
TOTAL-GS-HVA-211
|
2004
|
HVAC , Electrical heaters
|