API-1033A
|
1997
|
Full Scale Performance Tests of Environmentally Acceptable Thread Compounds
|
API-103R
|
1998
|
Issue Analysis Achieving The Kyoto Protocol: An Analysis Of Policy Options
|
API-10A
|
2005
|
SPECIFICATION FOR CEMENTS AND MATERIALS FOR WELL CEMENTING TWENTY-THIRD EDITION; ANSI/API 10A/ISO 10
|
API-10B-2
|
2013
|
Recommended Practice for Testing Well Cements - Second Edition
|
API-10B-3
|
2004
|
Recommended Practice on Testing of Deepwater Well Cement Formulations - First Edition
|
API-10B-4
|
2004
|
Recommended Practice on Preparation and Testing of Foamed Cement Slurries at Atmospheric Pressure -
|
API-10B-5
|
2005
|
Recommended Practice on Determination of Shrinkage and Expansion of Well Cement Formulations at Atmo
|
API-10B-6
|
2000
|
Recommended Practice on Determining the Static Gel Strength of Cement Formulations - First Edition
|
API-10D
|
2002
|
SPECIFICATION FOR BOW-SPRING CASING CENTRALIZERS SIXTH EDITION; ANSI/API 10D/ISO 10427-1-2001
|
API-10F
|
2002
|
Recommended Practice for Performance Testing of Cementing Float Equipment - Third Edition
|
API-1102
|
2007
|
Steel Pipelines Crossing Railroads and Highways - SEVENTH EDITION
|
API-1104
|
2013
|
Welding of Pipelines and Related Facilities Nineteenth Edition; Errata 1: October 31, 2001
|
API-1104-ERRATA
|
2007
|
Welding of Pipelines and Related Facilities - TWENTY-FIRST EDITIO
|
API-1107
|
1991
|
PIPELINE MAINTENANCE WELDING PRACTICES RP 1107 IS NOW PART OF 1104 19TH EDITION; ERRATA 1993
|
API-1111
|
2009
|
Design, Construction, Operation, and Maintenance of Offshore Hydrocarbon Pipelines (Limit State Desi
|
API-1112
|
1997
|
Developing a Highway Emergency Response Plan for Incidents Involving Hazardous Materials - Third Edi
|
API-1113
|
2000
|
Developing a Pipeline Supervisory Control Center Third Edition
|
API-1114
|
2013
|
Recommended Practice for the Design of Solution-Mined Underground Storage Facilities - Second Editio
|
API-1115
|
2007
|
Recommended Practice on the Operation of Solution-Mined Underground Storage Facilities
|
API-1117
|
2008
|
Recommended Practice for Movement in In-service Pipelines - THIRD EDITION
|
API-1120
|
1992
|
TRAINING AND QUALIFICATION OF LIQUID PIPELINE MAINTENANCE PERSONNEL R(1995)
|
API-1123
|
1996
|
DEVELOPMENT OF PUBLIC AWARENESS PROGRAMS BY HAZARDOUS LIQUID PIPELINE OPERATORS
|
API-1124
|
1991
|
SHIP, BARGE, AND TERMINAL HYDROCARBON VAPOR COLLECTION MANIFOLDS R(1995)
|
API-1125
|
1991
|
OVERFILL CONTROL SYSTEMS FOR TANK BARGES FIRST EDITION R(1995)
|
API-1127
|
1993
|
MARINE VAPOR CONTROL TRAINING GUIDELINES
|
API-1129
|
1996
|
ASSURANCE OF HAZARDOUS LIQUID PIPLINE SYSTEM INTEGRITY
|
API-1130
|
2002
|
Computational Pipeline Monitoring for Liquid Pipelines Second Edition
|
API-1133
|
2005
|
Guidelines for Onshore Hydrocarbon Pipelines Affecting High Consequence Floodplains - First Edition
|
API-1141
|
1994
|
GUIDELINES FOR CONFINED SPACE ENTRY ON BOARD TANK SHIPS IN THE PETROLEUM INDUSTRY
|
API-1157
|
1998
|
Hydrostatic Test Water Treatment and Disposal Options for Liquid Pipeline Systems - First Edition
|
API-1160
|
2001
|
Managing System Integrity for Hazardous Liquid Pipelines First Edition
|
API-1161
|
2012
|
Recommended Practice for Pipeline Operator Qualification (OQ) - Second Edition
|
API-1162
|
2010
|
Public Awareness Programs for Pipeline Operators - Second Edition
|
API-1163
|
2005
|
IN-LINE INSPECTION SYSTEMS QUALIFICATION STANDARD
|
API-1164
|
2004
|
PIPELINE SCADA SECURITY
|
API-1165
|
2007
|
Recommended Practice for Pipeline SCADA Displays - First Edition
|
API-1166
|
2005
|
Excavation Monitoring and Observation - First Edition
|
API-1167
|
2010
|
Pipeline SCADA Alarm Management - First Edition
|
API-1168
|
2008
|
Pipeline Control Room Management - First Edition
|
API-11AR
|
2000
|
Recommended Practice for Care and Use of Subsurface Pumps - Fourth Edition
|
API-11AX
|
2005
|
Specification for Subsurface Sucker Rod Pumps and Fittings Eleventh Edition; Errata 6/2002
|
API-11B
|
1998
|
SPECIFICATION FOR SUCKER RODS TWENTY-SIXTH EDITION
|
API-11BR
|
2008
|
Recommended Practice for the Care and Handling of Sucker Rods - Ninth Edition
|
API-11D1
|
2002
|
PETROLEUM AND NATURAL GAS INDUSTRIES - DOWNHOLE EQUIPMENT - PACKERS AND BRIDGE PLUGS FIRST EDITION
|
API-11D2
|
2010
|
Progressing Cavity Pump Systems for Artificial LiftùPumps
|
API-11D3
|
2008
|
Progressing Cavity Pump Systems for Artificial Lift_Surface-drive Systems
|
API-11E
|
2014
|
SPECIFICATION FOR PUMPING UNITS
|
API-11E-Errata
|
2009
|
SPECIFICATION FOR PUMPING UNITS R(2000) , ERRATA, MARCH 2009
|
API-11G
|
1994
|
RECOMMENDED PRACTICE FOR INSTALLATION AND LUBRICATION OF PUMPING UNITS R(2000)
|
API-11IW
|
2000
|
SPECIFICATION FOR INDEPENDENT WELLHEAD EQUIPMENT FIRST EDITION
|