ARAMCO-SAEP-1350
|
2005
|
Design Basis Scoping Paper (DBSP) Preparation and Revision Procedure
|
ARAMCO-SAEP-136
|
2005
|
Saudi Aramco Management of Electric Equipment Obsolescence Program
|
ARAMCO-SAEP-14
|
2005
|
Project Proposal
|
ARAMCO-SAEP-140
|
2005
|
Project Training Impact Assessment
|
ARAMCO-SAEP-15
|
2005
|
Preparation of Restricted Vendor Lists for Process Automation Systems
|
ARAMCO-SAEP-1510
|
2005
|
RVL – Products Management Procedure
|
ARAMCO-SAEP-16
|
2005
|
Project Execution Guide for Process Automation Systems
|
ARAMCO-SAEP-1610
|
2005
|
Preparation of Functional Specification Document
|
ARAMCO-SAEP-1622
|
2005
|
Preparation of Technical Bid Evaluation Plan Document for Process Automation Systems
|
ARAMCO-SAEP-1624
|
2005
|
Preparation of System Design Documents
|
ARAMCO-SAEP-1626
|
2005
|
Configuration and Graphics Guidelines
|
ARAMCO-SAEP-1628
|
2005
|
Preparation of Integration Specifications Document
|
ARAMCO-SAEP-1630
|
2005
|
Preparation of Integration Test Procedure Document
|
ARAMCO-SAEP-1634
|
2005
|
Factory Acceptance Test
|
ARAMCO-SAEP-1636
|
2005
|
Installation and Checkout Plan
|
ARAMCO-SAEP-1638
|
2005
|
Site Acceptance Test Plan
|
ARAMCO-SAEP-1640
|
2005
|
Operating Instructions for Process Automation Systems
|
ARAMCO-SAEP-1642
|
2005
|
Maintenance Manual for Process Automation Systems 2/28/2005 1/30/2002 2/1/2007
|
ARAMCO-SAEP-1661
|
2005
|
Waste Minimization Opportunity Assessments 1/31/05 11/30/2002 2/1/2010
|
ARAMCO-SAEP-1662
|
2005
|
Cleaning of Heat Exchangers and Unfired Plant Equipment 1/31/05 1/28/2004 2/1/2010
|
ARAMCO-SAEP-20
|
2005
|
Equipment Inspection Schedule
|
ARAMCO-SAEP-201
|
2005
|
Saudi Aramco Engineering Reports 3/31/2004 1/31/2001 4/1/2009
|
ARAMCO-SAEP-21
|
2005
|
Royalty/Custody Metering Facilities Execution Guide 5/3/12004 4/30/2003 6/1/2009
|
ARAMCO-SAEP-22
|
2005
|
Tank Calibration Requirements 4/4/2006 New 4/4/2011
|
ARAMCO-SAEP-301
|
2005
|
Instructions for Establishing and Maintaining Mandatory Saudi Aramco Engineering Requirements 11/13/
|
ARAMCO-SAEP-302
|
2005
|
Instructions for Obtaining a Waiver of a Mandatory Saudi Aramco Engineering Requirement 10/12/2005 0
|
ARAMCO-SAEP-303
|
2005
|
Engineering Reviews of Project Proposal and Detail Design Documentation 7/31/2002 12/31/1996 8/1/200
|
ARAMCO-SAEP-305
|
2005
|
Saudi Aramco Library Drawings 3/31/2004 11/30/1999 4/1/2009
|
ARAMCO-SAEP-306
|
2005
|
Evaluating the Remaining Strength of Corroded Pipelines 6/29/2005 3/29/2000 7/1/2010
|
ARAMCO-SAEP-308
|
2005
|
Plant Inspection Unit Reviews 5/31/2004 7/30/2003 6/1/2009
|
ARAMCO-SAEP-309
|
2005
|
Inspection of Community and Operations Support Facilities 6/30/2004 4/30/2000 7/1/2009
|
ARAMCO-SAEP-31
|
2005
|
Corporate Equipment and Spare Parts Data Requirements 9/30/2003 8/31/1998 10/1/2008
|
ARAMCO-SAEP-310
|
2005
|
Pipeline Repair and Maintenance 11/30/2005 1/29/2003 4/1/2006
|
ARAMCO-SAEP-3101
|
2005
|
Equipment and Spare Parts Data Requirements for Contractor Procured Equipment 9/30/2003 8/31/1998 10
|
ARAMCO-SAEP-3102
|
2005
|
Equipment and Spare Parts Data Requirements for SAPMT Originated Requisitions
|
ARAMCO-SAEP-3103
|
2005
|
Equipment and Spare Parts Data Requirements for Proponent/MRO Originated Requisitions 9/30/2003 8/31
|
ARAMCO-SAEP-311
|
2005
|
Installation of Hot Tapped and Stopple Connections
|
ARAMCO-SAEP-312
|
2005
|
PLIDCO Weld+Ends Couplings 01/31/05 1/29/2003 2/1/2010
|
ARAMCO-SAEP-313
|
2005
|
PLIDCO Split Sleeves 01/31/05 1/29/2003 2/1/2010
|
ARAMCO-SAEP-314
|
2005
|
Use of PLIDCO Smith Pipeline Repair Clamps 01/31/05 1/29/2003 2/1/2010
|
ARAMCO-SAEP-316
|
2005
|
Performance Qualification of Coating Personnel 11/13/2010 7/30/2003 8/1/2008
|
ARAMCO-SAEP-317
|
2005
|
Testing and Inspection (T&I) of Shell and Tube Heat Exchangers 7/30/2003 3/29/2000 8/1/2008
|
ARAMCO-SAEP-318
|
2005
|
Pressure Relief Valve Program Authorization for Installation, Deletion and Changes 10/31/2004 3/31/2
|
ARAMCO-SAEP-319
|
2005
|
Pressure Relief Valves – Routine Test, Inspection, Quality Assurance and Regulation 10/31/2004 10/30
|
ARAMCO-SAEP-32
|
2005
|
Environmental Performance Assessment (EPA) Program 6/30/2003 2/26/2003 3/1/2008
|
ARAMCO-SAEP-321
|
2005
|
Performance Qualification Testing and Certification of Saudi Aramco Welders 6/30/2003 1/31/2000 7/1/
|
ARAMCO-SAEP-322
|
2005
|
Performance Qualification Testing and Certification of Saudi Aramco Brazers 6/30/2003 1/31/2000 7/1/
|
ARAMCO-SAEP-323
|
2005
|
Performance Qualification Testing of Contract Welders and Brazers 6/30/2003 1/31/2000 7/1/2008
|
ARAMCO-SAEP-324
|
2005
|
Certification Review and Registration of Project Welders and Brazers 6/30/2003 1/31/2000 7/1/2008
|
ARAMCO-SAEP-325
|
2005
|
Inspection Requirements for Pressurized Equipment 6/30/2004 3/31/2001 7/1/2009
|